A closer look at the facility systems, repairs and projects behind our work.
Refrigeration installation
Process room refrigeration redundancy
The facility needed backup cooling for its process room. REMCO developed the retrofit plan and sourced new refrigeration equipment from a surplus supplier. Medford Wellington, one of REMCO’s preferred vendors, performed the HVAC installation. The photos follow the rooftop equipment lift and placement, then show the evaporators mounted inside the process room.
Select any photo to view it full size.
Crane lifting rooftop refrigeration equipment into position.Rooftop refrigeration equipment during the crane lift.Equipment positioning above the prepared rooftop support frame.Rooftop equipment seated on the timber support frame.Side view of rooftop refrigeration equipment and its support frame.Three-fan evaporator mounted inside the refrigerated space.Indoor evaporator installation above the strip curtain doorway.
After repeated storms caused severe flooding at this facility, the foundation sleeve and pipe penetration were identified as the entry point. We excavated approximately 12 feet to expose the area and complete a below-grade repair.
After cleaning around the penetration, we installed new backer rod and hydraulic cement. Using a W. R. Meadows foundation waterproofing system, we applied the liquid membrane primer in three coats, installed and rolled on the Kevlar adhesive detail strip, then covered the foundation with Mel-Rol membrane. We backfilled the excavation and added gutter drains and a French drain to carry water away from the building before it could reach the foundation.
After many storms since the installation, the facility has had no further signs of water intrusion.
Repair sequence
Excavation begins at the affected foundation area.Excavation to expose the below-grade foundation.Foundation base and sleeve area exposed for inspection.Pipe sleeve and foundation penetration before sealing.Detail strip installed and rolled around the penetration.Waterproofing layers applied across the exposed foundation.Mel-Rol membrane installed before backfill.Waterproofed foundation wall before backfill.Perimeter drainage routed along the building.Gutter drainage directed away from the foundation.
Before repair
Water intrusion during rain conditions
These videos show the water entry conditions that prompted the excavation and waterproofing work.
Water intrusion around the pipe penetration during the rain event.Additional footage of the water intrusion and saturated conditions.
The client wanted a mobile beer tap with room for two full-size kegs. REMCO designed and built the cart from the ground up. The kegs sit behind paneled doors in the lower cabinet. Each beer line runs through a chilling coil in the ice chest above, cooling the beer on its way to the faucet.
The cabinet sits on casters so the client can roll it into position for service. Fluted trim, a navy finish and brass-colored hardware give the cart the look of a piece of furniture while keeping the kegs and lines out of sight.
Test-fitting the two faucets and paneled doors before painting.Primed cabinet with the lower compartment open to show the space for two kegs.Navy finish on the ice chest enclosure, cabinet and fluted trim.Twin faucets and matching door pulls fitted in the shop.Finished mobile tap cart on casters, set up for service.